Free Estimate
We inspect your project and provide a free, no-obligation estimate.
Safe Demolition
Our team protects your property and performs the demolition safely.
Clean Up & Hauling
We remove all debris and leave the site clean and ready.
Licensed & Insured
Fully licensed and insured demolition contractor serving the Bay Area.
5-Year Compaction Warranty
Professional backfill and compaction backed by our warranty.
serving the Bay Area
Permit Assistance
We help with permits, inspections, and city requirements.
- San Jose
- Fremont
- Sunnyvale
- Santa Clara
- Milpitas
- Palo Alto
- Mountain View
- San Mateo
- Hayward
- And More!
Got More questions About Your Pool Demo Project?
HOW LONG DO PERMITS TAKE?
Permit approval times vary by city and county. Most pool demolition permits in the Bay Area take between 2 and 8 weeks. We handle the permit process from start to finish and keep you informed throughout the project.
DO I NEED AN ENGINEER?
some cities require engineering reports and compaction documentation. if needed, we coordinate directly with licensed engineers and handle the process for you.
HOW MUCH DO PERMITS COST?
Permit fees vary depending on the city and project requirements. Most permit costs range from $300 to $1500. We provide a clear estimate before starting the process.
HOW LONG DOES DEMOLITION TAKE?
Most pool demolition projects are completed within 3 to 7 workings days, depending on pool size, access condition, weather, and city inspection requirements
AFTER HIRE, WHEN DO YOU START?
Once the contract is signed, we begin the permit process immediately if permits are required. For projects without permits, we can often schedule work within 1 to 2 weeks.
ARE YOU LICENSED?
Yes. We are Licensed and insured California contractor. Licensed information is available upon request, and we are happy to provide proof of insurance
WHAT HAPPENS AFTER THE POOL IS REMOVED?
The pool is properly backfilled and compacted according to local requirements. The area can then be prepared for landscaping, artificial turf, pavers, concrete, or other future improvements.
DO YOU PROVIDE COMPACTION REPORTS?
Yes. When required by the city, we can coordinate compaction testing and engineering reports to ensure compliance with local building requirements.

Full Pool Demolition
• Complete removal of pool shell • All concrete removed from property • Engineer reports available • Soil compaction documentation • Ideal for ADUs and future construction • Building department compliant • Ready for foundations and structures • Maximum property value

Partial Pool Demolition
Partial Pool Demolition A cost-effective pool removal option designed for landscaping and hardscaping projects. * Removal of pool equipment * 3 drainage holes in the pool floor * 3-foot perimeter wall demolition around the entire pool * Permit assistance and inspections (if required) * Faster completion time * Lower project cost * Suitable for: * Landscaping * Artificial turf * Pavers * Patios * Garden areas * Outdoor living spaces Important: Partial Pool Demolition is generally intended for landscaping and hardscape improvements only. It is not recommended for future structures, home additions, ADUs, garages, or other building construction. If future construction is planned, a Full Pool Demolition may be required by the city, engineer, or building department.
Recent Demolition Projects
Professional pool demolition projects completed across the Bay Area
